advanced

Project 2: Operate a Managed Fleet with Staged Updates

Run a simulated fleet of at least 50 devices: a registry with desired and reported state, validated and bounded configuration, a signed firmware update with a rollback, a staged rollout that halts automatically on failures, a fleet health dashboard with an SLO and error budget, failure tests, and a privacy inventory.

8-10 hours

Project 2: Operate a Managed Fleet with Staged Updates

Run a simulated fleet of at least 50 devices: a registry with desired and reported state, validated and bounded configuration, a signed firmware update with a rollback, a staged rollout that halts automatically on failures, a fleet health dashboard with an SLO and error budget, failure tests, and a privacy inventory.

In this lesson:

  • project
  • fleet
  • device twin
  • ota
  • staged rollout
  • slo
  • observability
  • privacy
  • assignment

🔒 This lesson is part of a paid plan

This lesson is part of the Pro plan. Upgrade to unlock the full lesson, the labs and the exam.

Upgrade Now

This lesson is part of a paid plan

Upgrade to Pro to unlock this course, its labs and its exam.

View Pricing Plans